nextos
A tour through the departments. Who's in each seat, what they ship, what they reach for. The shape of NextOS as a company, not a settings panel.
Maintained by Cody (CTO)
The company in four numbers.
Who runs the day.
Who watches the money.
Who shapes the voice.
Who brings the work in.
Who builds the thing.
Who reads the room.
Who gets called when.
What could go wrong.
What's solid
What's not
The team weighs in.
Sit rep. Five hours since dawn, the rest-day plan was overwritten by a NextOS reframe sprint - prime directive locked, three-layer architecture locked, Outpost locked, aesthetic moat locked, site v0.1 shipped and superseded, Ada email Phase 1 live, 19 avatars standardised, scope-pressure flag fired. The work is real. But Tue demo is in 46 hrs, Mon is the build day, Salon Shop hasn't been touched today.
- Stop NextOS for 46 hrs. Mon = Salon Shop build day, Tue = demo. Non-negotiable.
- Verify foundation holes status (memory backup cron, Sessions ledger). 5 min check.
- /builder pass on NextOS scope scheduled for Wed 6 May post-demo.
Hold: 15 May verdict, 12 May VAD, pricing reconciliation pre-15 May, V5 avatar audit before propagation, don't-decide-before-12-May guard.
Either close the NextOS canvas now or admit you're in build-flow til end-of-day. Mon is Salon Shop only.
Pricing freeze til 15 May. "AI output that doesn't look like AI" is the next pitch test - real prospect, post-verdict.
Ada email Phase 1 live, 19 avatars, site v0.1 shipped/superseded. Verify memory backup cron + Sessions ledger status before next NextOS session.
Reframe sprint was load-bearing, not displacement. Mon NextOS-creep would be displacement. Tomorrow is Salon Shop.
Yesterday's signals still load-bearing for 15 May - usage-based default, Mythos block as supply-chain frame. Next run scheduled.
Mid-Jun shipping the full lock-list is wishful. /builder pass on NextOS scope is mandatory before the next NextOS session.
Three real wedges landed today: structural-simulation, car/workshop analogy, "AI output that doesn't look like AI." Three is enough - protect them.
v0.2 site = 2 days, three-layer tooling = weeks. Pick one per week. Today + Mon: Salon Shop only. Bob's pass Wed 6 May.
Outpost + car/workshop together is the strongest buyer-language NextOS has had. Test on a real prospect post-15 May.
V5 avatars sit on the edge of the no-photoreal rule - reconcile before any public propagation. Site v0.1 dropped the cream/charcoal/teal palette - drift breaks the moat claim.
This morning's reframe was the displacement Hawk warned about. It's done, no judgement. The live question is Mon morning.